Akita & Noshiro OWF
CLIENT: Kajima Corporation
ROLE: T&I Project Manager
SCOPE: Transport from Europe to Japan of 33 MPs and TPs and Installation Offshore (MPs and TPs) in Akita and Noshiro (Japan)
Project management, risk interfaces. Responsible for early phase concept engineering to full mechanical completion. Preparation of Method Statements, Risk Assessments, emergency response plans and safe working procedures. Implementation of requirements from MLIT during and before construction phase. Lead client approval and project certification by Japanese Class-NK.
Albatros Project – North Sea
CLIENT: Deme Offshore
ROLE: Lead roject Engineer for TP installation
SCOPE: Installation of TPs and ACs with Sea Installer (A2Sea, Deme Offshore)
Vessel planning, daily progress reports and PtW applications. Responsible for early phase concept engineering to full mechanical completion. Preparation of Method Statements, Risk Assessments, emergency response plans and safe working procedures. Implementation of German SchuSiKo during and before construction phase. Daily site coordination, planning, reporting and managing multidisciplinary subcontractors
Hohe See & Albatros Project – North Sea
CLIENT: Deme Offshore
ROLE: Lead Project Engineer & Offshore Installation manager
SCOPE: Installation of MPs from HLJV Innovation
Development of Noise Mitigation Concepts for German Waters (DBBC and NMS). Responsibility for design and fabrication of sea- fastening and installation tools for
MP, TP and AC installation. Preparation of installation method statements and risk assessments. Creation of deck-layouts and lifting plans.
Hohe See & Albatros Project – North Sea
CLIENT: Deme Offshore
ROLE: Lead Engineer for MP installation vessel mobilization
SCOPE: Innovation Mobilization
Lead engineer for sea-fastening and installation tools for HLJV Innovation in Vlissingen Netherlands. Managing subcontractors on vessel (steel fabricator, hydraulics, special purpose equipment) as well as project crew.
Hohe See & Albatros Project – North Sea
CLIENT: Deme Offshore
ROLE: Lead Engineer
SCOPE: Retrieval of foundations and installation equipment with shear leg Gulliver from Pacific Osprey
After a crane accident onboard the main installation vessel Pacific Osprey from SBO all project equipment including foundations as well as NMS and lifting tools had to be recovered from onboard Pacific Osprey by means of a feasible crane vessel (Gulliver). Lifting engineering and method statements as well as a contingency plan have been developed.
Hohe See Project – North Sea
CLIENT: GeoSea NV
ROLE: Lead Project Engineer & Offshore Installation manager
SCOPE: Installation of MPs, TPs, ACs from Pacific Osprey
Offshore Installation manager for Transport & Installation of Monopiles (MPs), Transition Pieces (TPs) and Anode Cages (ACs) with Heavy Lift Jack-Up vessel Sea Pacific Osprey (Swire Blue Ocean).
Hohe See Project – North Sea
CLIENT: GeoSea NV
ROLE: Lead Project Engineer and Site Manager
SCOPE: Mobilization of Installation vessel Pacific Osprey
Lead of mobilization works for sea-fastening of MPs, TPs and ACs as well as project installation equipment.
Coordination of subcontractors and daily planning of lifting and welding works.
Hohe See Project – North Sea
CLIENT: GeoSea NV
ROLE: Lead Project Engineer and Method Engineer
SCOPE: Installation Planning and engineering and logistics
Preparation and development of logistic barge feeder concept for transportation of foundation from Rotterdam to Eemshaven. Responsible for design and fabrication of sea-fastening for main installation vessel and barges. General project preparation for installation vessel (Pacific Osprey) including deck-layouts, lifting drawings, Method Statements, ITPs, Risk Assessments etc.
Baltic 2 Project – Baltic Sea
CLIENT: Hochtief Solutions AG
ROLE: Offshore Installation Manager
SCOPE: Jacket installation with Stanislav Yudin
Installation of Jackets for the BALTIC 2 project with floating crane vessel Stanislav Yudin (SHL). Lifting of jackets from barges (offshore feedering, offshore lift).
Baltic 2 Project – Baltic Sea
CLIENT: JV Hochtief Solutions AG & GeoSea NV
ROLE: Offshore Installation Manager
SCOPE: Jacket installation with sheerleg Taklift 4
Installation of Jackets for the BALTIC 2 project with sheerleg Taklift 4 (Boskalis). Load-out of jackets in Sweden, Trelleborg.
Baltic 2 Project – Baltic Sea
CLIENT: JV Hochtief Solutions AG & GeoSea NV
ROLE: Project engineer
SCOPE: Jacket installation and logistic concept
Jacket installation, including pre-piling (includes preparation phase, installation, grouting and remedial works). Management of nearshore and offshore logistics of barge feeder concept, vessel selection and BIMCO contract negotiations. Follow-up on MWS and BSH comment sheets. Creation of Safe Working Procedures, RAs and general project documentation.
Baltic 2 Project – Baltic Sea
CLIENT: JV Hochtief Solutions AG & GeoSea NV
ROLE: Naval Architect
SCOPE: WTG installation consultancy for marine document package
Preparation of all engineering calculations for WTG package, including of Motion Analysis, loading plan, hydrostatics and lifting engineering.
Processing of MetOcean data and workability calculations and stochastic.
Global Tech 1 – North Sea
CLIENT: Employee at Hochtief Offshore
ROLE: Naval Architect and marine consultant
SCOPE: Project consultant for marine related topics
Dynamic lifting analysis for tripod installation, Motion Analysis, deck-layouts and vessel positioning drawings.
Ballasting and load-out calculations for WTG logistic scope.
Responsible for model tests of gravity based foundation (Gravitas) projects, floating foundations (BlueH) as well as ship model tests of jack-up vessels.
Vessel design and calculations Innovation and Thor
CLIENT: Employee at Hochtief Solutions AG
ROLE: Naval Architect
SCOPE: Innovation transit design criteria and Thor stability booklet for vessel conversion
✓ Hydrostatics and stability of Innovation (Thor and Innovation vessel operational manual) according to DNV, MODU and IS code.
✓ Motion Analysis for HLJV vessels and barges including Air Gap calculations. Dynamic Lifting Analysis for offshore lifts.
✓ Hydrodynamic Analysis of offshore floating foundations. Coding and automation automatic (Python and Matlab).